BIM技术在变电修理技改工程管理中的应用
详细信息    查看全文 | 推荐本文 | 收藏本文
  • 英文篇名:Application of BIM Technology in the Management of Substation Repair and Technical Renovation Project
  • 作者:高明 ; 刘玲 ; 陈文娟 ; 田静 ; 白珂
  • 英文作者:Gao Ming;Liu Ling;Chen Wenjuan;Tian Jing;Bai Ke;Foshan Power Supply Bureau of Guangdong Power Grid Co., Ltd.;Guangzhou Jinyuan Science and Technology Development Co., Ltd.;
  • 关键词:三图联动 ; 安全管理 ; 修理技改 ; 模库一体化 ; 项目集管理
  • 英文关键词:Linkage of Three Diagrams;;safety management;;repair and technical renovation;;module base integration;;program management
  • 中文刊名:建设科技
  • 英文刊名:Construction Science and Technology
  • 机构:广东电网有限责任公司佛山供电局;广州劲源科技发展股份有限公司;
  • 出版日期:2020-01-15
  • 年:2020
  • 期:01
  • 基金:广东电网有限责任公司科技项目资助(项目编号:03600kk52180006)
  • 页:34-39
  • CN:11-4705/TU
  • ISSN:1671-3915
  • 分类号:TM63
摘要
BIM技术应用于电网领域的变电修理技改工程,是对已有的项目管理系统的补充和完善,作为有效的辅助管理工具,是对传统变电修理技改管理模式的进一步提升;通过"三图联动"、施工方案动态模拟及风险评估,强化变电修理技改项目全过程的管控,在控制施工进度、质量、成本,以及对档案、各专业团队的人员管理方面能够起到显著效果;特别是通过安全风险管理,BIM技术直观地为施工人员提供工作区域指引和风险提示,在保障人员安全方面有着极其重大的意义。
    BIM technology is applied to the power transformation repair and technical renovation project in the field of power grid, which is a supplement and improvement to the existing project management system. As an effective auxiliary management tool, BIM technology is a further improvement and promotion of the traditional management mode of substation repair and technical renovation. Through the "Linkage of Three Diagrams", dynamic simulation of construction scheme and risk assessment, BIM Technology strengthens the management and control of the whole process of the substation repair and technical renovation project, which can play a significant role in controlling the construction progress, quality and cost, as well as personnel management of archives and professional teams. Especially for the judgement of safety risks, BIM can intuitively provide working area guidance and risk tips for the workers, and guarantee the construction progress, which is of great significance in ensuring personnel safety.
引文
[1]田静,白珂.BIM在智能电网资产可视化管理中的应用[J].建筑技术,2019,50(7):822-825.